Figure 1.
VR intersects 2.7% TREO with 28.5% PMREO at South Rim, the second area of high grade REE critical metals discovered at Hecla-Kilmer to-date
January 23, 2023 09:00 ET | VR Resources
Drill Hole HK22-020:  212 m of continuous mineralization at 0.7% TREO with 17% PMREO, with one metre samples up to 2.7% TREO(1) with 28.5% PMREO(2), and including 48 m @ 1.0 % TREO with 19% PMREO at...
Figure 1.
VR extends continuous REE mineralization at Hecla-Kilmer to over 500 metre vertical depth in Hole 13, starting at surface and ending in 2.84 % TREO with gold
January 17, 2023 09:00 ET | VR Resources
Drill Hole HK22-013: 361 m @ 0.96 % TREO(1) of which 20% are PMREO(2) within 461 m @ 0.85 % TREO + 0.13% Nb2O5, starting at bedrock surface, and including: 39 m @ 2.01 % TREO within 66.6 m @ 1.57 %...
Photo 1
VR receives new over-limit geochemical data from Hole HK22-013 and increases PMREO content to 21.1% of TREO at Hecla-Kilmer in Northern Ontario
November 29, 2022 09:00 ET | VR Resources
VANCOUVER, British Columbia, Nov. 29, 2022 (GLOBE NEWSWIRE) -- VR Resources Ltd. (TSX.V: VRR, FSE: 5VR; OTCQB: VRRCF), the "Company", or “VR”, is pleased to report receipt of additional geochemical...