BuildForce logo ENG.png
Construction demands in Ontario remain elevated through 2029
March 26, 2024 06:00 ET | Buildforce Canada
BuildForce Canada published its 2024–2033 Construction and Maintenance Looking Forward report for Ontario today. The outlook calls for...
La demande dans le s
La demande dans le secteur ontarien de la construction demeurera élevée jusqu’en 2029
March 26, 2024 06:00 ET | ConstruForce Canada
OTTAWA, 26 mars 2024 (GLOBE NEWSWIRE) -- En 2023, l’activité a ralenti dans le secteur résidentiel de l’Ontario en raison de la hausse des coûts d’emprunt et de construction. Cependant, le secteur...
Introducing a New Summer Camp Experience for Children in Care: CAMP NAWAPON at Mattawa River Resort
February 19, 2024 14:49 ET | Mattawa River Resort
Every child deserves an opportunity for an unforgettable time at Camp. Camp Nawapon is located on the Mattawa River, on the edge of Algonquin Park.
exp_Logo_cmyk.png
EXP announces new Northern Ontario Engineering Sector
October 03, 2023 13:30 ET | EXP
NORTH BAY, Ontario, Oct. 03, 2023 (GLOBE NEWSWIRE) -- EXP, a global engineering, architecture, design and consulting firm, has announced the establishment of a new Northern Ontario Engineering...
wata.png
Wawakapewin First Nation Energized by Wataynikaneyap Power
September 29, 2023 12:30 ET | Wataynikaneyap Power
The ‘line that brings light’ connects Wawakapewin First Nation to the provincial power grid
wata.png
Bearskin Lake First Nation Energized by Wataynikaneyap Power
August 23, 2023 15:00 ET | Wataynikaneyap Power
FORT WILLIAM FIRST NATION, Ontario, Aug. 23, 2023 (GLOBE NEWSWIRE) -- Wataynikaneyap Power is pleased to announce the energization of Bearskin Lake First Nation. The northern Ontario community was...
orea.png
Timiskaming Shores Continues to be an Affordable Place to Buy a Home
August 10, 2023 16:39 ET | Ontario Real Estate Association
TIMISKAMING SHORES, Ontario, Aug. 10, 2023 (GLOBE NEWSWIRE) -- Mid-year market data released by the Timmins, Cochrane & Timiskaming Districts Association of REALTORS® (TCTDAR) shows the overall...
Figure 1.
VR intersects 2.7% TREO with 28.5% PMREO at South Rim, the second area of high grade REE critical metals discovered at Hecla-Kilmer to-date
January 23, 2023 09:00 ET | VR Resources
Drill Hole HK22-020:  212 m of continuous mineralization at 0.7% TREO with 17% PMREO, with one metre samples up to 2.7% TREO(1) with 28.5% PMREO(2), and including 48 m @ 1.0 % TREO with 19% PMREO at...
Figure 1.
VR extends continuous REE mineralization at Hecla-Kilmer to over 500 metre vertical depth in Hole 13, starting at surface and ending in 2.84 % TREO with gold
January 17, 2023 09:00 ET | VR Resources
Drill Hole HK22-013: 361 m @ 0.96 % TREO(1) of which 20% are PMREO(2) within 461 m @ 0.85 % TREO + 0.13% Nb2O5, starting at bedrock surface, and including: 39 m @ 2.01 % TREO within 66.6 m @ 1.57 %...
Photo 1
VR receives new over-limit geochemical data from Hole HK22-013 and increases PMREO content to 21.1% of TREO at Hecla-Kilmer in Northern Ontario
November 29, 2022 09:00 ET | VR Resources
VANCOUVER, British Columbia, Nov. 29, 2022 (GLOBE NEWSWIRE) -- VR Resources Ltd. (TSX.V: VRR, FSE: 5VR; OTCQB: VRRCF), the "Company", or “VR”, is pleased to report receipt of additional geochemical...